Even the highest quality basketball court wood flooring product will fail to deliver its full potential if the installation process is not done properly. NB brand fully understands the critical importance of the installation stage, and has built one of the strictest standardized installation systems in the entire industry. Every single installation step has clear operation specifications, making sure that every completed NB basketball court wood flooring can 100% deliver all its designed professional performance.
Before the installation team even enters the venue, NB’s professional engineers will carry out a full survey of the original concrete ground. Using high-precision levels, they measure the flatness of the entire ground, requiring that the error under a 2-meter straight edge cannot exceed 3 millimeters. If the original ground does not meet this standard, they will first apply self-leveling cement to make the base perfectly flat, laying a solid foundation for the subsequent installation of the basketball court wood flooring. The engineers will also measure the temperature and humidity at the site, and let all the flooring materials rest at the venue for 24 hours in advance. This allows the wood to fully adapt to the local environment, preventing stress deformation after installation.
The keel installation stage is the core of the entire basketball court wood flooring installation process. NB requires that the spacing error between every two keels cannot exceed 5 millimeters. After fixing all keels to the ground, the installation team must shake every single keel by hand to make sure there is no movement at all. The top surface of every keel must be on exactly the same horizontal plane, with no height difference anywhere. Ventilation channels are reserved between keels to allow air circulation at the bottom of the floor system, preventing moisture buildup and mold growth in the enclosed space. After all keels are installed, the engineers will carry out a full tapping inspection: every point on the keels must produce an even solid sound, with no hollow or squeaking noise. Any position that does not meet the standard must be re-adjusted immediately.
When it comes to the final panel installation stage, NB’s experienced installers will pre-sort all panels first, grouping boards with similar grain patterns and colors to make the visual effect of the entire basketball court wood flooring uniform and beautiful. The joints between panels must be perfectly tight, with gaps controlled below 0.05 millimeters. At the same time, according to the venue’s orientation and local annual humidity, precise expansion gaps are reserved around the edges next to the walls. These gaps are calculated to be large enough to prevent the floor from bulging when wood expands, but small enough to not ruin the appearance. After the entire installation is finished, NB’s quality control team will run three rounds of full performance inspections, testing shock absorption rate, ball bounce rate, surface flatness and many other indicators. Only after all indicators fully meet the FIBA competition standards will the project be delivered to the customer.

Leave a Reply