No matter how high-quality the basketball court wood flooring product itself is, if the installation process is not professional enough, it is difficult to finally present the expected excellent performance. NB Sports has a set of standardized and precise professional installation process for its basketball court wood flooring, which ensures that every laid court can achieve excellent flatness and overall stability. Before the formal installation, NB's professional engineering team will first conduct a detailed inspection of the venue base, level the ground to ensure that the flatness of the base meets the installation standards, and do a good job in the moisture-proof treatment of the ground in advance. Then, the LVL larch battens are arranged at precise intervals, and the level is used to adjust the levelness of each batten one by one to ensure that the entire load-bearing structure is on the same horizontal plane. After that, the surface panels of Grade A hard maple are installed in strict accordance with the mortise and tenon double joint process. The professional installers will adjust the tightness of the connection between each board to ensure that the gaps between all panels are uniform and consistent. After the installation of all the floor panels is completed, the engineering team will use a 2m long straight ruler to check the flatness of the entire court one by one, to ensure that the gap between the ruler and the floor does not exceed 2mm, completely eliminating the problem of local unevenness. Finally, the surface is polished and the exclusive 95° high-gloss topcoat is applied, so that the entire basketball court wood flooring presents a smooth, flat and delicate surface effect. This rigorous full-process control ensures that every NB basketball court wood flooring venue can achieve the perfect flatness standard, providing a stable and reliable competitive surface for players.
Basketball Court Wood Flooring: NB’s Precision Installation Process for Perfect Flatness

Leave a Reply