A high-quality indoor basketball wood flooring product

The Installation Standard System of NB Indoor Basketball Wood Flooring A high-quality indoor basketball wood flooring product must be matched with a professional and standardized installation process to finally exert all its excellent performance. NB has established a complete set of strict installation standard system for its indoor basketball wood flooring products, ensuring that every project can achieve the best use effect after construction, and avoid various problems caused by non-standard installation.

Before the official installation, NB’s professional engineering team will first carry out a comprehensive inspection and treatment on the original ground of the venue. They will check the flatness, humidity and hardness of the concrete ground one by one. For the ground that does not meet the installation requirements, they will carry out grinding, leveling and special moisture-proof treatment in advance. This pre-treatment work is the foundation of the entire floor system. Many hidden dangers such as floor deformation and hollowing in the later stage are often caused by the unqualified treatment of the original ground, and NB strictly controls this link to eliminate these hidden dangers from the source.

In the formal laying stage, NB’s engineering technicians will strictly follow the process requirements of the mortise and tenon double joint craft. They will accurately adjust the splicing gap between each floor panel according to the temperature and humidity of the venue at that time, to reserve a reasonable expansion space for the wood to adapt to the later seasonal temperature and humidity changes. Unlike the rough construction method of directly nailing or gluing the floor, NB’s installation process pays more attention to the independent stress performance of each floor panel, so that the entire floor system can form a whole with uniform force, and will not produce local arching or warping due to partial stress concentration.

After the floor panels are laid, NB’s team will carry out multiple fine grinding treatments on the entire floor surface. This process can make the height difference between all adjacent panels completely zero, ensuring that the entire court is as smooth as a mirror. Then, the exclusive NB 95° high-gloss topcoat will be applied in strict accordance with the number of process requirements. Each layer of paint needs to be fully polished and dust-removed after drying, and then the next layer of paint can be sprayed. This meticulous painting process ensures that the surface paint film is uniform and firm, with excellent wear resistance and anti-slip performance.

After the entire installation project is completed, NB will also carry out a full set of performance tests on the venue, including floor flatness detection, shock absorption performance test, friction coefficient detection and other items. Only after all test indicators meet the professional standards can the project be officially delivered to the user. This whole-process strict control from pre-construction inspection to final acceptance ensures that every NB indoor basketball wood flooring venue can achieve the best quality, and also lets users truly feel the professionalism and responsibility of the NB brand.